Road Construction

This map presents the potential and recommended wind turbine locations (T1, T2 and T3).   It also show the 7.4KM  interconnection line between the HQD substation, project Control Center and the Wind turbine (dark red lines with lightning logo) as well as the access road that will be used to deliver the equipment to the site (the green line is the existing road and the light red line is the 2.4KM new road to access the turbine).

Road Constructions